In the course of the extension of the substation, a new 330kV line compartments were built in the substation, a power transformer foundation with an oil separation system was built, relay protection and automation systems were installed, 20kV reactors were installed and a new 330kV transformer procured by Elering was installed. The works also included the construction of ground circuit, lightning protection system, outdoor lighting, fence and roads. Substation expansion was carried out by the turnkey method, which means that in addition to the design and construction work, all the necessary equipment were supplied, installed, adjusted, tested and energized.
In addition to strengthening the power connection between Estonia and Latvia, the extension of Sindi substation will increase Elering’s capacity to regulate voltage, i.e. to ensure the quality of electricity in the Pärnu region. Two 330kV overhead lines will be connected to the line compartment to be constructed, one of which will go to the Sopi substation near the Tootsi settlement and the other via Lihula to the Harku substation near the Tallinn.
On 1 July 2021, Merko Ehitus Eesti acquired a stake in Connecto Eesti, and the Merko electrical construction business line merged with Connecto. Acting jointly under the Connecto brand makes it possible for us to offer a significantly broader range of services – in addition to the design, construction and maintenance of low, medium and high voltage electricity networks, Connecto also operates in the field of telecommunications and gas networks.
View the works performed by Connecto.
- Client:
- Elering AS
- Name of the project:
- Extension of the Sindi 330kV substation
- Category:
- Civil engineering
- Type of construction:
- Power infrastructure
- Chief Designer:
- AS Merko Infra
- Description of work:
- Reconstruction
- Country:
- Estonia
- Address:
- Urge village, Tori rural municipality, Pärnu County
- Beginning of the project:
- 2019
- Year of completion:
- 2020