Kasutad veebilehitsejat, mida tootja enam ei uuenda. Palun vaheta veebilehitsejat või laadi turvaliseks internetikülastuseks ja meie veebilehe sisu õigesti nägemiseks alla uuem brauser:

Merko GroupMerko Group

Reconstruction of the switchgear at Sindi 110kV substation



Location

Description of work

Other

Status

Time of completion


Buildings
Civil engineering
Concrete works

The Sindi substation’s 110 kV switchgear was renovated using the turnkey method. A 110 kV external switchgear installation with 8 capacity switches were built, connected to overhead lines, two voltage transformers and one OPT along with control, auxiliary and monitoring systems. A new control building was built. The old 110 kV switchgear installation was demolished.

On 1 July 2021, Merko Ehitus Eesti acquired a stake in Connecto Eesti, and the Merko electrical construction business line merged with Connecto. Acting jointly under the Connecto brand makes it possible for us to offer a significantly broader range of services – in addition to the design, construction and maintenance of low, medium and high voltage electricity networks, Connecto also operates in the field of telecommunications and gas networks.

View the works performed by Connecto.

Client:
Elering AS
Name of the project:
Reconstruction of the switchgear at Sindi 110kV substation
Category:
Civil engineering
Type of construction:
Power infrastructure
Architect:
Jako Järvsaar (AS Merko Ehitus Eesti)
Chief Designer:
AS Merko Infra
Description of work:
Reconstruction
Country:
Estonia
Address:
Urge village, Sauga rural municipality, Pärnu County
Beginning of the project:
2017
Year of completion:
2018