The Sindi substation’s 110 kV switchgear was renovated using the turnkey method. A 110 kV external switchgear installation with 8 capacity switches were built, connected to overhead lines, two voltage transformers and one OPT along with control, auxiliary and monitoring systems. A new control building was built. The old 110 kV switchgear installation was demolished.
On 1 July 2021, Merko Ehitus Eesti acquired a stake in Connecto Eesti, and the Merko electrical construction business line merged with Connecto. Acting jointly under the Connecto brand makes it possible for us to offer a significantly broader range of services – in addition to the design, construction and maintenance of low, medium and high voltage electricity networks, Connecto also operates in the field of telecommunications and gas networks.
View the works performed by Connecto.
- Client:
- Elering AS
- Name of the project:
- Reconstruction of the switchgear at Sindi 110kV substation
- Category:
- Civil engineering
- Type of construction:
- Power infrastructure
- Architect:
- Jako Järvsaar (AS Merko Ehitus Eesti)
- Chief Designer:
- AS Merko Infra
- Description of work:
- Reconstruction
- Country:
- Estonia
- Address:
- Urge village, Sauga rural municipality, Pärnu County
- Beginning of the project:
- 2017
- Year of completion:
- 2018