The work included the reconstruction of quays 8 and 9 and the breakwater at Hundipea harbour on Tallinn Bay. On the harbour side of the existing quay, we installed sheet pile walls along the new quay line. In front of quay 8, the water depth is 6 m and, in front of quay 9, 10 m; on the sea side, we built a breakwater consisting of 3,600 tetrapods.
The length of the quays is 183 m and the length of the breakwater 207 m; 3,500 m³ of polluted soil were removed by dredging.
- Client:
- Veeteede Amet (Maritime Administration)
- Name of the project:
- Reconstruction of quais 8 and 9 and breakwater at Hundipea harbour in Tallinn
- Category:
- Civil engineering
- Type of construction:
- Port facilities
- Chief Designer:
- OÜ EstKONSULT
- Description of work:
- Reconstruction
- Country:
- Estonia
- Address:
- Lume str 9, Tallinn
- Beginning of the project:
- 2018
- Year of completion:
- 2020