Reconstruction of quais 8 and 9 and breakwater at Hundipea harbour in Tallinn



Location

Description of work

Other

Status

Time of completion


Buildings
Civil engineering
Concrete works

The work included the reconstruction of quays 8 and 9 and the breakwater at Hundipea harbour on Tallinn Bay. On the harbour side of the existing quay, we installed sheet pile walls along the new quay line. In front of quay 8, the water depth is 6 m and, in front of quay 9, 10 m; on the sea side, we built a breakwater consisting of 3,600 tetrapods.

The length of the quays is 183 m and the length of the breakwater 207 m; 3,500 m³ of polluted soil were removed by dredging.

Client:
Veeteede Amet (Maritime Administration)
Name of the project:
Reconstruction of quais 8 and 9 and breakwater at Hundipea harbour in Tallinn
Category:
Civil engineering
Type of construction:
Port facilities
Chief Designer:
OÜ EstKONSULT
Description of work:
Reconstruction
Country:
Estonia
Address:
Lume str 9, Tallinn
Beginning of the project:
2018
Year of completion:
2020