As part of the project, a total of 13.4 km of water pipelines, 13.9 km of sewerage pipelines, 1.4 km pressurized sewerage pipelines, 8 waste water pumping stations, and 4 bore well pumping stations were renovated.
- Client:
- AS Tapa Vesi
- Name of the project:
- Procurement for design and construction of the city of Tapa’s water and sewerage systems
- Category:
- Civil engineering
- Type of construction:
- Water and sewerage pipelines, storm water drain lines
- Description of work:
- Reconstruction
- Country:
- Estonia
- Address:
- Tapa, Lääne-Virumaa
- Beginning of the project:
- 2010
- Year of completion:
- 2013